I know that nobody looks at this page… but I figure I’ll document my process none-the-less.
Feb 25th and 26th of 2017 saw a lot of demolition work.
I removed two walls that the prior owner had put up (for some unknown reason).
This exposed the outside wall and gave me a small pile of 2×4 material to use someplace.
After I got two walls down, I was able to expose the crock for the sump pump and the Radon gas system.
These two obstacles, I will have to work around.